How to install a drip edge.
Proper way to install roof drip edge.
Preformed drip edge can be made of aluminum galvanized steel or copper.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
How to fix a roof drip edge installing roof drip edge flashing properly.
Slightly open the hemmed edge to slide this piece over top of the installed piece on the eave.
Make sure the outer edge extends over the gutter.
How to install drip edge flashing to a new roof.
On the gable rake install drip edge starting at the bottom and working up.
If it doesn t pull the drip edge out slightly from under the shingles.
This could cause the sheathing or fascias to rot after a few years.
Save yourself some.
Place the metal roof drip edge flashing along the gable ends.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Overlap pieces at least a couple of inches shingle style with pieces higher up on the roof overlapping pieces lower.
The easiest way to prevent this from happening is to install a drip edge at the eave and the rake.
Align the leading bottom edge of the first piece on the gable rake with the front edge of the drip edge installed on the eave.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Once all the underlayment is applied go back and place.
Tom silva starts off his roofing lesson with the apprentices by stressing the.
When lapping the eave metal overlap them so the seam faces away from the direction of prevailing view.
The causeway connecting the house to the new garage in law suite needs a roof.
Three tips for overlapping drip edge flashing.
Install roof drip edge along the eaves add underlayment then place drip.
Secure the drip edge with roofing cement.