Step flashing sidewalls on roofs covered with asphalt shingles wood shingles shakes and slate should be flashed using step flashing like you see here.
Roof tile counter flashing detail.
Sp 17 usp sp surface mounted counter flashing detail.
14 3 10 pipes turbines vents etc.
Extend the clay tile flashing under the tile a minimum of 6 inches or as specified by the tile manufacturer.
3 06 valley termination onto roof plane 11 3 07 flashing and counter flashings at wall abutments 11 3 08 head and apron flashing 12 3 09 standard curb mounted skylights chimneys etc.
This collection of 18 articles animations and videos identifies the critical roof flashing areas illustrates durable roof flashing details and shows how to flash roofs right in the real world.
Sp 16 usp sp gutter flashing detail.
Gibraltar drip edge flashing can be used with asphalt shingles or metal roofing panels.
15 3 11 batten installation 16 3 12 tile installation 17 3 13 flat low medium and high profile tile 19 3 14 valleys.
The extra kick at the bottom of the face directs run off away from the structure.
Size up the job.
A copper receiver holds the counterflashing at its top edge.
Copper flashing is locked into this edge and extends at least 8 up the wall.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
Typically 10 by 8 inch 253 mm x 203 mm flashing is chosen.
Sp 18 usp sp cut in reglet counter flashing detail.
Further your step flashing pieces need to be 10 inches 254 mm long and at least 2 inches 50 mm wider than the exposure of the shingle you re using.
This drip edge flashing provides protection from water damage along the eaves and rake of a roof.
Sp 20 usp sp non removable equipment curb flashing.
For example 3 tab shingles usually have a 5 5 8 inch 143 mm exposure.
Sp 19 usp sp removable equipment curb flashing detail.
The top of the roof pan is formed into a bread pan whose upper edge is just above the finished batten.
Sp 14 usp sp clad metal joint flashing detail.
Sp 15 usp sp locking fascia edge flashing detail.
Tile roof details recommended at openings and walls at walls dormers chimneys and other vertical surfaces extend the flashing up at least 6 inches and counterflash.